Add docs/supply-chain/outreach-drafts-2026-05-24.md template (per Section 15.14) #100

Closed
opened 2026-05-26 09:04:22 -03:00 by navigator · 2 comments
Owner

Goal

Create the outreach-drafts file at docs/supply-chain/outreach-drafts-2026-05-24.md that PLAN.md Section 15.14 names as the initial-drafts landing spot for Phase 1 supplier engagement. The file collects boilerplate email/inquiry templates for the four Phase 1 outreach targets so the existing 'Supplier pre-qualification outreach (Phase 1)' issue has a structured place to land actual drafts.

Sections (one per supplier, each a template stub):

  • IHP130 / Europractice (foundry — wk 1-2 per Section 15.14)
  • PCBWay (PCB fab — wk 4-6)
  • VeriSilicon (PHY/SerDes IP — wk 8-10)
  • JCET Group (OSAT — wk 12-14)

Each template stub includes:

  • Subject line placeholder
  • Recipient role placeholder (engineering vs sales)
  • 3-5 line body skeleton (intro, project pitch one-liner, specific ask, expected response artifact, contact info placeholder)
  • Sanction/EAR posture statement template (Brazilian customer, clean transaction path)
  • TODO markers for project-specific numbers (die area, layer count, balls, etc.)

Also include at the top:

  • Brief instructions on how to use the templates
  • Reminder that pre-qualification per Section 15.1 is mandatory before commitments
  • Cross-link to per-supplier eval.md paths under docs/supply-chain/<supplier>/

Acceptance criteria

  • docs/supply-chain/outreach-drafts-2026-05-24.md exists with the four supplier template sections
  • Status: Draft templates header
  • Each template has placeholders for project-specific numbers (no fabricated values)
  • Cross-references PLAN.md Sections 15.1, 15.2, 15.3, 15.4, 15.7, 15.14
  • No commitments or pricing in templates — only structural skeleton
  • Does NOT modify or duplicate any existing docs/supply-chain/<supplier>/eval.md content if present

Plan refs

Section 15.14 (engagement timeline — names this file explicitly), Section 15.1 (pre-qualification protocol), Sections 15.2/15.3/15.4/15.7 (per-supplier context)

Notes

Template scaffolding only. Outreach itself is tracked by the existing 'Supplier pre-qualification outreach (Phase 1)' issue — this file gives that issue a structured place to commit actual draft text. Do not fabricate vendor email addresses or contact names.

## Goal Create the outreach-drafts file at `docs/supply-chain/outreach-drafts-2026-05-24.md` that PLAN.md Section 15.14 names as the initial-drafts landing spot for Phase 1 supplier engagement. The file collects boilerplate email/inquiry templates for the four Phase 1 outreach targets so the existing 'Supplier pre-qualification outreach (Phase 1)' issue has a structured place to land actual drafts. Sections (one per supplier, each a template stub): - IHP130 / Europractice (foundry — wk 1-2 per Section 15.14) - PCBWay (PCB fab — wk 4-6) - VeriSilicon (PHY/SerDes IP — wk 8-10) - JCET Group (OSAT — wk 12-14) Each template stub includes: - Subject line placeholder - Recipient role placeholder (engineering vs sales) - 3-5 line body skeleton (intro, project pitch one-liner, specific ask, expected response artifact, contact info placeholder) - Sanction/EAR posture statement template (Brazilian customer, clean transaction path) - TODO markers for project-specific numbers (die area, layer count, balls, etc.) Also include at the top: - Brief instructions on how to use the templates - Reminder that pre-qualification per Section 15.1 is mandatory before commitments - Cross-link to per-supplier `eval.md` paths under `docs/supply-chain/<supplier>/` ## Acceptance criteria - [ ] `docs/supply-chain/outreach-drafts-2026-05-24.md` exists with the four supplier template sections - [ ] `Status: Draft templates` header - [ ] Each template has placeholders for project-specific numbers (no fabricated values) - [ ] Cross-references PLAN.md Sections 15.1, 15.2, 15.3, 15.4, 15.7, 15.14 - [ ] No commitments or pricing in templates — only structural skeleton - [ ] Does NOT modify or duplicate any existing `docs/supply-chain/<supplier>/eval.md` content if present ## Plan refs Section 15.14 (engagement timeline — names this file explicitly), Section 15.1 (pre-qualification protocol), Sections 15.2/15.3/15.4/15.7 (per-supplier context) ## Notes Template scaffolding only. Outreach itself is tracked by the existing 'Supplier pre-qualification outreach (Phase 1)' issue — this file gives that issue a structured place to commit actual draft text. Do not fabricate vendor email addresses or contact names.
Author
Owner
No description provided.
<!-- agent:claim by=dispatcher run=20260526T120815Z_issue100 ts=1779797296 -->
Author
Owner
No description provided.
<!-- agent:pr pr=#102 branch=auto/issue-100-20260526T120815Z_issue100 -->
navigator 2026-05-26 09:13:49 -03:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1#100
No description provided.