Draft docs/funding/tapeout-rfq.md skeleton (EN) #56

Closed
opened 2026-05-25 15:04:09 -03:00 by navigator · 2 comments
Owner

Goal

Create the EN-language tapeout RFQ skeleton listed as deliverable #9 in PLAN.md Section 10. This is structural scaffolding so funding/outreach work has a known location to land. No fabricated quotes or commitments — placeholders only.

Sections to include (EN headings):

  • Executive summary (placeholder)
  • Project overview (FluidPopV1, RISC-V accelerator, 8-SoC board)
  • Technical specifications (chip die size estimate range, BGA pin budget ~1100, target nodes IHP130 Edu / SMIC N+2 Pro — all as ranges/TBD)
  • Quantities and overhead (>= 12 packaged chips per board per Section 11.1)
  • IP content statement (declaration that design contains no US-origin IP requiring re-export licensing)
  • Lead time expectations (IHP130 ~6 months MPW; SMIC N+2 16-24 weeks)
  • Deliverables expected from foundry (GDSII handoff format, PDK version, DRC/LVS sign-off criteria)
  • Sanction-aware terms (Brazilian customer, EAR/BIS posture)
  • Contact and timeline

Acceptance criteria

  • docs/funding/tapeout-rfq.md exists with the sections above in English
  • Each section has TODO marker and 2-3 line intent description
  • Status: Draft skeleton + Owner: TBD header
  • References PLAN.md Section 11.1 (tapeout cost ranges) and Section 15.2 (foundry stack)
  • No fabricated prices — only ranges already in PLAN.md (US$ 300k-1.5M, NRE US$ 5-15M)
  • docs/funding/README.md updated to list this deliverable if present

Plan refs

Section 10 (deliverable #9 — EN tapeout RFQ); Section 11.1 (tapeout costs); Section 15.2 (foundry stack); Section 15.14 (engagement timeline)

Notes

EN per language convention (RFQ goes to international foundries). Skeleton only — actual RFQ content lands as Phase 5 approaches and supplier outreach yields concrete contacts.

## Goal Create the EN-language tapeout RFQ skeleton listed as deliverable #9 in PLAN.md Section 10. This is structural scaffolding so funding/outreach work has a known location to land. No fabricated quotes or commitments — placeholders only. Sections to include (EN headings): - Executive summary (placeholder) - Project overview (FluidPopV1, RISC-V accelerator, 8-SoC board) - Technical specifications (chip die size estimate range, BGA pin budget ~1100, target nodes IHP130 Edu / SMIC N+2 Pro — all as ranges/TBD) - Quantities and overhead (>= 12 packaged chips per board per Section 11.1) - IP content statement (declaration that design contains no US-origin IP requiring re-export licensing) - Lead time expectations (IHP130 ~6 months MPW; SMIC N+2 16-24 weeks) - Deliverables expected from foundry (GDSII handoff format, PDK version, DRC/LVS sign-off criteria) - Sanction-aware terms (Brazilian customer, EAR/BIS posture) - Contact and timeline ## Acceptance criteria - [ ] `docs/funding/tapeout-rfq.md` exists with the sections above in English - [ ] Each section has `TODO` marker and 2-3 line intent description - [ ] `Status: Draft skeleton` + `Owner: TBD` header - [ ] References PLAN.md Section 11.1 (tapeout cost ranges) and Section 15.2 (foundry stack) - [ ] No fabricated prices — only ranges already in PLAN.md (US$ 300k-1.5M, NRE US$ 5-15M) - [ ] `docs/funding/README.md` updated to list this deliverable if present ## Plan refs Section 10 (deliverable #9 — EN tapeout RFQ); Section 11.1 (tapeout costs); Section 15.2 (foundry stack); Section 15.14 (engagement timeline) ## Notes EN per language convention (RFQ goes to international foundries). Skeleton only — actual RFQ content lands as Phase 5 approaches and supplier outreach yields concrete contacts.
Author
Owner
No description provided.
<!-- agent:claim by=dispatcher run=20260525T191448Z_issue56 ts=1779736488 -->
Author
Owner
No description provided.
<!-- agent:pr pr=#60 branch=auto/issue-56-20260525T191448Z_issue56 -->
navigator 2026-05-25 16:20:20 -03:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1#56
No description provided.