Draft docs/funding/tapeout-rfq.md skeleton (EN) #121

Open
opened 2026-05-27 15:05:06 -03:00 by navigator · 3 comments
Owner

Goal

Create the EN-language tapeout RFQ skeleton listed as deliverable #9 in PLAN.md Section 10. Structural scaffolding so funding/outreach work has a known location to land. No fabricated quotes or commitments — placeholders only.

Sections to include (EN headings):

  • Executive summary (placeholder)
  • Project overview (FluidPopV1, RISC-V accelerator, 8-SoC board)
  • Technical specifications (chip die size range, BGA pin budget ~1100, target nodes IHP130 Edu / SMIC N+2 Pro — all as ranges/TBD)
  • Quantities and overhead (>= 12 packaged chips per board per Section 11.1)
  • IP content statement (declaration that design contains no US-origin IP requiring re-export licensing)
  • Lead time expectations (IHP130 ~6 months MPW; SMIC N+2 16-24 weeks)
  • Deliverables expected from foundry (GDSII handoff format, PDK version, DRC/LVS sign-off criteria)
  • Sanction-aware terms (Brazilian customer, EAR/BIS posture)
  • Contact and timeline

Acceptance criteria

  • docs/funding/tapeout-rfq.md exists with the sections above in English
  • Each section has TODO marker and 2-3 line intent description
  • Status: Draft skeleton + Owner: TBD header
  • References PLAN.md Section 11.1 (tapeout cost ranges) and Section 15.2 (foundry stack)
  • No fabricated prices — only ranges already in PLAN.md (US$ 300k-1.5M, NRE US$ 5-15M)
  • docs/funding/README.md updated to list this deliverable if present

Plan refs

Section 10 (deliverable #9 — EN tapeout RFQ); Section 11.1 (tapeout costs); Section 15.2 (foundry stack); Section 15.14 (engagement timeline)

Notes

EN per language convention (RFQ goes to international foundries). Skeleton only — actual RFQ content lands as Phase 5 approaches and supplier outreach yields concrete contacts.

## Goal Create the EN-language tapeout RFQ skeleton listed as deliverable #9 in PLAN.md Section 10. Structural scaffolding so funding/outreach work has a known location to land. No fabricated quotes or commitments — placeholders only. Sections to include (EN headings): - Executive summary (placeholder) - Project overview (FluidPopV1, RISC-V accelerator, 8-SoC board) - Technical specifications (chip die size range, BGA pin budget ~1100, target nodes IHP130 Edu / SMIC N+2 Pro — all as ranges/TBD) - Quantities and overhead (>= 12 packaged chips per board per Section 11.1) - IP content statement (declaration that design contains no US-origin IP requiring re-export licensing) - Lead time expectations (IHP130 ~6 months MPW; SMIC N+2 16-24 weeks) - Deliverables expected from foundry (GDSII handoff format, PDK version, DRC/LVS sign-off criteria) - Sanction-aware terms (Brazilian customer, EAR/BIS posture) - Contact and timeline ## Acceptance criteria - [ ] `docs/funding/tapeout-rfq.md` exists with the sections above in English - [ ] Each section has `TODO` marker and 2-3 line intent description - [ ] `Status: Draft skeleton` + `Owner: TBD` header - [ ] References PLAN.md Section 11.1 (tapeout cost ranges) and Section 15.2 (foundry stack) - [ ] No fabricated prices — only ranges already in PLAN.md (US$ 300k-1.5M, NRE US$ 5-15M) - [ ] `docs/funding/README.md` updated to list this deliverable if present ## Plan refs Section 10 (deliverable #9 — EN tapeout RFQ); Section 11.1 (tapeout costs); Section 15.2 (foundry stack); Section 15.14 (engagement timeline) ## Notes EN per language convention (RFQ goes to international foundries). Skeleton only — actual RFQ content lands as Phase 5 approaches and supplier outreach yields concrete contacts.
Author
Owner
No description provided.
<!-- agent:claim by=dispatcher run=20260527T180709Z_issue121 ts=1779905230 -->
Author
Owner
Explanation:

Issue #121 is a verbatim duplicate of issue #56 ("Draft docs/funding/tapeout-rfq.md skeleton (EN)"), which was already resolved and merged via PR #60 (commit d0c2335 on main).

Current state on main (base of this worktree, tip 153e6e1):

  • docs/funding/tapeout-rfq.md exists with all nine EN sections required by the acceptance criteria (Executive summary, Project overview, Technical specifications, Quantities and overhead, IP content statement, Lead time expectations, Deliverables expected from foundry, Sanction-aware terms, Contact and timeline).
  • Header carries Status: Draft skeleton and Owner: TBD.
  • Each section has a TODO marker plus 2–3 line intent description.
  • References PLAN.md Section 11.1 (tapeout cost ranges US$ 300k–1.5M, NRE US$ 5–15M) and Section 15.2 (IHP130 Edu / SMIC N+2 Pro foundry stack).
  • No fabricated prices — only ranges already in PLAN.md.
  • docs/funding/README.md lists the file with Status: Draft skeleton.

All six acceptance-criteria checkboxes are already satisfied on main. Producing a PR would be either an empty diff or churn. Suggested resolution: close #121 as duplicate of #56.

<!-- agent:fail reason=blocker:duplicate-already-merged --> Explanation: Issue #121 is a verbatim duplicate of issue #56 ("Draft docs/funding/tapeout-rfq.md skeleton (EN)"), which was already resolved and merged via PR #60 (commit d0c2335 on main). Current state on main (base of this worktree, tip 153e6e1): - `docs/funding/tapeout-rfq.md` exists with all nine EN sections required by the acceptance criteria (Executive summary, Project overview, Technical specifications, Quantities and overhead, IP content statement, Lead time expectations, Deliverables expected from foundry, Sanction-aware terms, Contact and timeline). - Header carries `Status: Draft skeleton` and `Owner: TBD`. - Each section has a `TODO` marker plus 2–3 line intent description. - References PLAN.md Section 11.1 (tapeout cost ranges US$ 300k–1.5M, NRE US$ 5–15M) and Section 15.2 (IHP130 Edu / SMIC N+2 Pro foundry stack). - No fabricated prices — only ranges already in PLAN.md. - `docs/funding/README.md` lists the file with `Status: Draft skeleton`. All six acceptance-criteria checkboxes are already satisfied on main. Producing a PR would be either an empty diff or churn. Suggested resolution: close #121 as duplicate of #56.
Author
Owner
No description provided.
<!-- agent:fail reason=no-pr-marker run=20260527T180709Z_issue121 -->
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1#121
No description provided.