Supplier pre-qualification outreach (Phase 1) #8

Open
opened 2026-05-24 03:12:49 -03:00 by navigator · 1 comment
Owner

Per PLAN.md Section 15.14. Drafts DRAFTED at docs/supply-chain/outreach-drafts-2026-05-24.md.

Timeline:

  • Week 1-2: IHP/Europractice
  • Week 4-6: PCBWay
  • Week 8-10: VeriSilicon
  • Week 12-14: JCET Group

Update docs/supply-chain/outreach-drafts-2026-05-24.md outreach log table after each send/response.

Tripwire (F-S1): if three formal contact attempts to SMIC declined.

Per PLAN.md Section 15.14. Drafts DRAFTED at docs/supply-chain/outreach-drafts-2026-05-24.md. Timeline: - Week 1-2: IHP/Europractice - Week 4-6: PCBWay - Week 8-10: VeriSilicon - Week 12-14: JCET Group Update docs/supply-chain/outreach-drafts-2026-05-24.md outreach log table after each send/response. **Tripwire (F-S1):** if three formal contact attempts to SMIC declined.
Author
Owner
No description provided.
<!-- agent:pinged ts=1779646452 -->
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1#8
No description provided.