PHY options survey + partnership outreach (USP-LSI, UFRGS GME, IIT Madras) #6

Closed
opened 2026-05-24 03:12:49 -03:00 by navigator · 9 comments
Owner

Per PLAN.md Section 13. Survey DRAFTED at docs/phy/phy-options.md.

Next steps:

  1. Confirm channel-loss budget for 8-chip water-cooled carrier
  2. Engage USP-LSI (Prof. Van Noije) + UFRGS GME with formal scoping doc; NDAs + IP assignment letters
  3. Begin BAG primitive port to IHP SG13G2 (4-6 person-months)
  4. Issue RFQs to Innosilicon + VeriSilicon for SMIC N+2 SerDes
  5. Engage Brazilian export-control counsel re: FDPR exposure

Tripwire (F-T4): all 4 PHY paths confirmed unavailable.

Per PLAN.md Section 13. Survey DRAFTED at docs/phy/phy-options.md. Next steps: 1. Confirm channel-loss budget for 8-chip water-cooled carrier 2. Engage USP-LSI (Prof. Van Noije) + UFRGS GME with formal scoping doc; NDAs + IP assignment letters 3. Begin BAG primitive port to IHP SG13G2 (4-6 person-months) 4. Issue RFQs to Innosilicon + VeriSilicon for SMIC N+2 SerDes 5. Engage Brazilian export-control counsel re: FDPR exposure **Tripwire (F-T4):** all 4 PHY paths confirmed unavailable.
Author
Owner
No description provided.
<!-- agent:pinged ts=1779646452 -->
Author
Owner

Queued by Marcos para o swarm não ficar idle enquanto #2 (CT 250) aguarda provisionamento humano.

Resolver: priorizar drafts em repo (docs only), NÃO enviar nada externamente. Boa entrega: 1 PR com 1-2 dos cinco next steps drafted como markdown em docs/phy/. Ex.: scoping doc para USP-LSI/UFRGS GME, ou template de RFQ Innosilicon/VeriSilicon. NÃO tentar item 3 (BAG primitive port — 4-6 person-months, fora do escopo de 600 LOC).

<!-- agent:queued by=navigator while=#2-blocked-human ts=$(date -u +%s) --> Queued by Marcos para o swarm não ficar idle enquanto #2 (CT 250) aguarda provisionamento humano. **Resolver: priorizar drafts em repo (docs only), NÃO enviar nada externamente.** Boa entrega: 1 PR com 1-2 dos cinco next steps drafted como markdown em `docs/phy/`. Ex.: scoping doc para USP-LSI/UFRGS GME, ou template de RFQ Innosilicon/VeriSilicon. NÃO tentar item 3 (BAG primitive port — 4-6 person-months, fora do escopo de 600 LOC).
Author
Owner
No description provided.
<!-- agent:claim by=dispatcher run=20260524T221154Z_issue6 ts=1779660714 -->
Author
Owner
No description provided.
<!-- agent:heartbeat run=20260524T221154Z_issue6 ts=1779661014 -->
Author
Owner
No description provided.
<!-- agent:fail reason=no-pr-marker run=20260524T221154Z_issue6 -->
Author
Owner

Phantom block cleared — earlier failure was from the rebase incident, not a real resolver block. Re-queuing for a fresh run on current main (skeleton from #37 is already there; this run should focus on the scoping doc + RFQ drafts under docs/phy/).

Phantom block cleared — earlier failure was from the rebase incident, not a real resolver block. Re-queuing for a fresh run on current main (skeleton from #37 is already there; this run should focus on the scoping doc + RFQ drafts under `docs/phy/`).
Author
Owner
No description provided.
<!-- agent:claim by=dispatcher run=20260525T173842Z_issue6 ts=1779730723 -->
Author
Owner
No description provided.
<!-- agent:heartbeat run=20260525T173842Z_issue6 ts=1779731023 -->
Author
Owner
No description provided.
<!-- agent:pr pr=#55 branch=auto/issue-6-20260525T173842Z_issue6 -->
navigator 2026-05-25 14:45:31 -03:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1#6
No description provided.