docs(funding): PHY academic partnership outreach letters (Issue #6) #15

Merged
navigator merged 1 commit from feature/phy-outreach-letters into main 2026-05-24 11:36:45 -03:00
Owner

Closes Issue #6 (PHY options survey + partnership outreach — letter drafts).

Drafts of three formal outreach letters to academic groups for the Edu PHY academic route per docs/phy/phy-options.md Section 6 (Phased Recommendation):

  • docs/funding/outreach-usp-lsi.md (PT-BR, ~870 words): to Prof. Wilhelmus A. M. Van Noije, LSI USP. Co-design of PopLink PHY Edu (IHP130 4 Gb/s) starting from Purdue OpenSerDes; BAG methodology. Bolsa R$ 4-6k/24 months (estimated), CHARRUA v1.2 IP, dc01-br1 access, EUR 30k MPW shuttle (preliminary).

  • docs/funding/outreach-ufrgs-gme.md (PT-BR, ~890 words): to GME coordinator placeholder. Differentiated scope: GME co-leads analog front-end (driver + receiver) while other partners cover CDR/digital. Radiation-hardening for Phase 7.

  • docs/funding/outreach-iit-madras-shakti.md (EN, ~880 words): to Prof. Shanthi Pavan, cc Prof. Nagendra Krishnapura. iCS group. Parallel research track: BAG-generated open SerDes for SMIC N+2 as hedge against Innosilicon commercial terms. USD 18k visiting PhD (preliminary). BRICS Brazil-India sovereignty framing.

All marked Status Draft v1 pending review by Marcos before sending.

Tests: docs-only. CI runs no validation on .md files beyond presence checks. Per GitOps workflow, will be auto-merged via infra/forgejo/auto-merge.sh once CI green.

Closes Issue #6 (PHY options survey + partnership outreach — letter drafts). Drafts of three formal outreach letters to academic groups for the Edu PHY academic route per docs/phy/phy-options.md Section 6 (Phased Recommendation): - docs/funding/outreach-usp-lsi.md (PT-BR, ~870 words): to Prof. Wilhelmus A. M. Van Noije, LSI USP. Co-design of PopLink PHY Edu (IHP130 4 Gb/s) starting from Purdue OpenSerDes; BAG methodology. Bolsa R$ 4-6k/24 months (estimated), CHARRUA v1.2 IP, dc01-br1 access, EUR 30k MPW shuttle (preliminary). - docs/funding/outreach-ufrgs-gme.md (PT-BR, ~890 words): to GME coordinator placeholder. Differentiated scope: GME co-leads analog front-end (driver + receiver) while other partners cover CDR/digital. Radiation-hardening for Phase 7. - docs/funding/outreach-iit-madras-shakti.md (EN, ~880 words): to Prof. Shanthi Pavan, cc Prof. Nagendra Krishnapura. iCS group. Parallel research track: BAG-generated open SerDes for SMIC N+2 as hedge against Innosilicon commercial terms. USD 18k visiting PhD (preliminary). BRICS Brazil-India sovereignty framing. All marked Status Draft v1 pending review by Marcos before sending. Tests: docs-only. CI runs no validation on .md files beyond presence checks. Per GitOps workflow, will be auto-merged via infra/forgejo/auto-merge.sh once CI green.
docs(funding): PHY academic partnership outreach letters (Issue #6)
All checks were successful
build / scalafmt-check (push) Successful in 4s
build / sbt-compile (push) Successful in 3s
build / shell-lint (push) Successful in 1m4s
build / scalafmt-check (pull_request) Successful in 3s
build / sbt-compile (pull_request) Successful in 3s
build / shell-lint (pull_request) Successful in 8s
a668c89719
Drafts of three formal outreach letters per docs/phy/phy-options.md
Section 6 (Phased Recommendation) for the Edu PHY academic route:

- docs/funding/outreach-usp-lsi.md (PT-BR, ~870 words): to Prof.
  Wilhelmus A. M. Van Noije, LSI USP. Co-design of PopLink PHY Edu
  (IHP130 4 Gb/s) starting from Purdue OpenSerDes; BAG methodology.
  Bolsa R$ 4-6k/24 months (estimated), CHARRUA v1.2, dc01-br1 access,
  EUR 30k MPW shuttle (preliminary). Kickoff Q3 2026.

- docs/funding/outreach-ufrgs-gme.md (PT-BR, ~890 words): to GME
  coordinator placeholder. Differentiated scope: GME co-leads
  analog front-end (driver + receiver diferencial) while other
  partners cover CDR/digital. Radiation-hardening for Phase 7.
  Same collaboration model.

- docs/funding/outreach-iit-madras-shakti.md (EN, ~880 words): to
  Prof. Shanthi Pavan, cc Prof. Nagendra Krishnapura. iCS group.
  Parallel research track: BAG-generated open SerDes for SMIC N+2
  as hedge against Innosilicon commercial terms. USD 18k visiting
  PhD (preliminary). BRICS/Brazil-India sovereignty framing. MoU
  target Q3 2026.

All marked Status: Draft v1 pending review. Each cites
docs/phy/phy-options.md + PLAN.md Section 13.
fluidpop-bot approved these changes 2026-05-24 11:34:48 -03:00
Dismissed
fluidpop-bot left a comment
Collaborator

CI green (head a668c89719), auto-approving

CI green (head a668c8971930e275b8e8b4065291d47f891a6fea), auto-approving
navigator force-pushed feature/phy-outreach-letters from a668c89719
All checks were successful
build / scalafmt-check (push) Successful in 4s
build / sbt-compile (push) Successful in 3s
build / shell-lint (push) Successful in 1m4s
build / scalafmt-check (pull_request) Successful in 3s
build / sbt-compile (pull_request) Successful in 3s
build / shell-lint (pull_request) Successful in 8s
to 3d50fc6bec
All checks were successful
build / scalafmt-check (push) Successful in 3s
build / sbt-compile (push) Successful in 3s
build / shell-lint (push) Successful in 8s
build / scalafmt-check (pull_request) Successful in 3s
build / sbt-compile (pull_request) Successful in 3s
build / shell-lint (pull_request) Successful in 8s
2026-05-24 11:35:56 -03:00
Compare
fluidpop-bot left a comment
Collaborator

CI green (head 3d50fc6bec), auto-approving

CI green (head 3d50fc6becea8939bc532bcdb47a4d7d72c9a18d), auto-approving
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Fluid/fluidpop-v1!15
No description provided.