docs(phy): partnership scoping doc + commercial RFQ template + outreach log #55
No reviewers
Labels
No labels
adr
agent:blocked-ci
agent:blocked-human
agent:blocked-resolver
agent:done
agent:in-progress
agent:no-touch
agent:pinged
agent:pr-open
agent:queued
agent:wip
area:board
area:funding
area:infra
area:phy
area:poplink
area:rtl
area:software
area:supply-chain
area:verification
ci-failed
ci-timeout
docs
do-not-merge
human-approved
needs-human-approval
needs-rebase
needs-triage
phase:1
ready-for-review
review:findings
review:pass
risk:tripwire
swarm:quarantined
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Fluid/fluidpop-v1!55
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "auto/issue-6-20260525T173842Z_issue6"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Summary
Issue #6 asks for three concrete outreach artifacts on top of the
phy-options.mdskeleton already in main:docs/phy/partnership-scoping.md— formal scoping document forUSP-LSI, UFRGS GME, Unicamp CCS and IIT Madras. Covers project
context, target spec (with explicit
<FILL>placeholders, nopre-fabricated numbers), channel context for the water-cooled 8-chip
carrier, IP and licensing framing compatible with CHARRUA + AGPL
while protecting student publication rights, NDA / contracting flow,
and the funding caveat (subject to PACID).
docs/phy/rfq-commercial.md— RFQ template for Innosilicon /VeriSilicon / Alphawave on SMIC N+2. Mandates an export-control /
FDPR chain-of-title attestation in Section 6; responses omitting
that section will not be evaluated. Covers deliverables, target
spec, RTL interface (
PopLinkPHYIO), commercial terms requested,and evaluation criteria.
docs/phy/outreach-log.md— append-only tracker keyed bypartner / vendor, state, reference doc, and owner. Hosts the F-T4
tripwire (all four PHY paths confirmed unavailable → escalate).
docs/phy/README.mdindex updated to list the three new files.What this PR is NOT
ranges. The
phy-options.mdskeleton mandates that those only appearafter a signed RFQ response or a signed scoping memo. All concrete
numbers in the new docs are
<FILL>placeholders or cross-referencesto PLAN.md and existing ADRs.
they ship after legal review of the IP framing (Section 5) and the
export-control attestation language (Section 6).
Acceptance criteria mapping (issue #6)
outreach-log.md"Other workstreams" row pins it as pending board CFD outputs;partnership-scoping.md§4 lists the inputs we can share under NDA. Closes-out remains for board work to land.partnership-scoping.mdis that document; NDA + IP-assignment flow in §6.outreach-log.md, blocked on academic partner selection (correct dependency).rfq-commercial.mdis the template; vendor rows seeded inoutreach-log.md.outreach-log.md.Test plan
Closes #6.
CI green (head
cffd924b74), auto-approving